JR BUILDERS

Services

In process

How we work

Every job follows the same order, and Janik is on site through all of it. These photographs are from our own job sites.

Before we build

  1. Request a timeSend the form. We confirm by phone or email within one business day.
  2. Walk the projectWe measure, look at structure and access, and talk through options and budget.
  3. Get a written estimateAn itemized scope, price and schedule, usually within a week of the visit.

The four stages

Man in a JR Builders shirt looking up at new framing on a job site, with a crew member behind him1 / 7On site

Stage 1 · Structure

Structure & steel

It starts behind the walls: new posts and beams set, steel welded in, floors opened and reframed.

Built-in cabinetry installed in a room with a plywood-topped island awaiting stone1 / 9Cabinetry

Stage 2 · Cabinetry

Cabinetry going in

Built-ins, vanities and islands are installed and leveled before a single slab is cut.

Blue-grey veined stone bar top with an ogee edge being cleaned after installation, floor covered with drop cloths1 / 11Stone bar top

Stage 3 · Stone, tile & metal

Stone, tile & metal

Slabs are set and polished, floors tiled, and brass finished by hand on site.

Painter on a scaffold tower in a stair hall, with the ironwork and lantern wrapped in plastic1 / 7Painting

Stage 4 · Finishing

Paint & final details

Ironwork wrapped, ceilings painted from the scaffold, then the reveal.

Before and after

Knotty pine paneled library with exposed trusses, built-in bookshelves and a fireplace, before renovation1 / 8Before: library

Before & after · Bel-Air

Antelo View Estate: before & after

The knotty pine library became a home gym, the living room was stripped back to its stone fireplace and French doors, the theatre was rebuilt with tiered seating and a new screen wall, and the primary bedroom went from cream carpet and drapes to dark wood floors and soft grey walls. Flip through to see each room before and after.

Exterior before the renovation1 / 28Before · Exterior

Before & after · Sherman Oaks

Sutton: before & after

Dark floors, stacked stone and heavy cabinetry gave way to white oak, porcelain and clean lines. Flip through to see each room before and after.

Planning a project?

Free site visit, about 45 minutes, no obligation.

Instagram

Follow the work as it happens

New projects, job-site moments and finishes, posted at @jrbuilders.la.

Follow @jrbuilders.la