1 / 7On siteStage 1 · Structure
Structure & steel
It starts behind the walls: new posts and beams set, steel welded in, floors opened and reframed.
In process
Every job follows the same order, and Janik is on site through all of it. These photographs are from our own job sites.
1 / 7On siteStage 1 · Structure
It starts behind the walls: new posts and beams set, steel welded in, floors opened and reframed.
1 / 9CabinetryStage 2 · Cabinetry
Built-ins, vanities and islands are installed and leveled before a single slab is cut.
1 / 11Stone bar topStage 3 · Stone, tile & metal
Slabs are set and polished, floors tiled, and brass finished by hand on site.
1 / 7PaintingStage 4 · Finishing
Ironwork wrapped, ceilings painted from the scaffold, then the reveal.
1 / 8Before: libraryBefore & after · Bel-Air
The knotty pine library became a home gym, the living room was stripped back to its stone fireplace and French doors, the theatre was rebuilt with tiered seating and a new screen wall, and the primary bedroom went from cream carpet and drapes to dark wood floors and soft grey walls. Flip through to see each room before and after.
1 / 28Before · ExteriorBefore & after · Sherman Oaks
Dark floors, stacked stone and heavy cabinetry gave way to white oak, porcelain and clean lines. Flip through to see each room before and after.